Search This Blog

Showing posts with label NYS asbestos regulations. Show all posts
Showing posts with label NYS asbestos regulations. Show all posts

Tuesday, February 18, 2025

The Role of Asbestos Inspections in Construction Safety: Don't Miss the Asbestos Inspection Panel at PACNY's Environmental Conference!

In the construction world, one of the most pressing concerns for worker safety is the potential asbestos exposure.  This hazardous material, once commonly used in various building materials for its fire-resistant and other properties, has been linked to serious health risks, including lung cancer, asbestosis, and mesothelioma.  Asbestos exposure remains a significant threat, especially in older buildings undergoing renovation or demolition.  The Environmental Protection Agency (EPA) and the Occupational Safety and Health Administration (OSHA) have set strict guidelines to minimize this danger, but compliance hinges on one key factor: thorough and accurate asbestos inspections.

To explore the intricacies of asbestos inspections, Angelo Garcia, III of Future Environment Designs, Inc., will be moderating a distinguished panel at PACNY's 2025 Environmental Conference on Thursday, February 27, 2025. The panel will dive deep into the importance and differences in asbestos inspections from various perspectives. This includes Tom Laubenthal of TGL Consulting and ASTM E2356 Chairman, who will discuss the ASTM asbestos inspection standard, Chris Alonge now with Dormitory Authority of the State of New York (DASNY) who will provide insights from an owner's perspective, Marc Rutstein from Environmental Consulting & Management Services, who will offer a consultant's viewpoint and highlight the differences between NYCDEP and NYSDOL inspections, and Matt Brooks from International Asbestos Removal (IAR), who will speak on the contractor’s perspective.

Asbestos pipe insulation with fitting insulation

Asbestos inspections play a vital role in identifying materials that may contain asbestos before they are disturbed. This proactive approach not only prevents worker exposure but also ensures that proper abatement procedures are followed. A well-executed asbestos inspection is the first line of defense against the release of airborne asbestos fibers, which can be deadly when inhaled.

Understanding the Importance of Homogeneous Areas

At the heart of every asbestos inspection is the process of determining whether a material is classified as a surfacing material, thermal system insulation, or miscellaneous material.  Once the material type is identified, the inspector must establish whether the materials are homogeneous.  According to the EPA’s Asbestos Hazard Emergency Response Act (AHERA), a homogeneous area is defined as one where the material is uniform in color and texture.  

Floor tiles and numerous homogeneous areas

However, that is not the only definition of homogeneous area/material.  For example, the American Society for Testing and Materials (ASTM) has established a Standard Practice for Comprehensive Asbestos Surveys (ASTM E2356-18) in this standard the definition of homogeneous area is surfacing material, thermal system insulation material, or miscellaneous material that is uniform in color and texture and apparent or known date of installation. The other definitions that are used by inspectors also include some reference to installation or formulation in addition to color and texture.  This classification is crucial because it informs the number of samples that must be taken to accurately assess the presence of asbestos.

Sampling Procedures: The Foundation of a Successful Inspection

For surfacing materials, the size of the homogeneous area directly influences the number of samples needed. Under the EPA’s guidelines, inspectors follow the “3-5-7 rule.” This means that three samples are required for areas smaller than 1,000 square feet, five samples for areas between 1,000 and 5,000 square feet, and seven samples for areas larger than 5,000 square feet. Additionally, the EPA’s “Pink Book,” formally known as Asbestos in Buildings: Simplified Sampling Scheme for Friable Surfacing Materials, recommends taking nine samples per homogeneous area, regardless of the square footage, for increased accuracy.

Asbestos Fireproofing

For thermal system insulation, the process differs slightly. Inspectors must determine if the material is homogeneous, patch material, or material used on fittings like elbows and valves. Homogeneous areas of thermal system insulation require three samples, while patch materials smaller than six linear or square feet only need one sample (the only time one sample is allowed). Cement or plaster used on fittings must be sampled based on the specific mechanical system in question, and a minimum of two samples is required for each system. However, the EPA in A Guide to Performing Reinspections Under AHERA strongly advises taking at least three samples in larger homogeneous areas, even if regulations don't mandate it.

For materials such as joint compound and add-on materials, however, the EPA’s “Asbestos Sampling Bulletin dated September 30, 1994” specifies that three samples are required for each material. These distinctions are critical for asbestos inspectors to ensure compliance and accuracy in their assessments (see our original blog post on asbestos surveys).

In May 2007, the EPA provided important clarification on sampling requirements.  Mr. Chris Alonge, at the time, was working for New York State Department of Labor (NYSDOL) and he requested clarification regarding the number of samples that should be taken for each suspect asbestos-containing homogeneous miscellaneous material.  The clarification was distributed by the Professional Abatement Contractors of New York (PACNY) in November 2007. According to this clarification, the minimum number of samples that should be taken of miscellaneous materials (i.e., floor tiles, roofing, caulk, ceiling tiles) is two (see our original blog post on this issue).

Respirator and protective clothing should be worn by the inspector during sampling

Following proper sampling protocols is crucial because asbestos is considered present if any one of the samples from a homogeneous area contains more than 1% asbestos. Conversely, if all samples return asbestos concentrations at or below 1%, the area is deemed asbestos-free—though it’s important to remember that materials containing 1% or less of asbestos are still regulated under OSHA’s asbestos standard (see the Varga letter).

The Legal and Health Implications of Incomplete Inspections

Inadequate or incorrect asbestos inspections can have severe consequences.  From a legal standpoint, failing to adhere to EPA and OSHA regulations can result in hefty fines and penalties.  Remember neither regulation has a specific end date for buildings not containing asbestos (see our post Is There an Appropriate End Date for Asbestos Use?).  More importantly, from a health perspective, improperly identifying or failing to identify asbestos-containing materials (ACMs) can expose construction workers to dangerous fibers, leading to long-term health problems.  Given that asbestos-related diseases may take decades to develop, the human cost of negligent inspections can be devastating.

The closet door with asbestos core was cut without any precautions costing over $30,000 to clean up the contamination.

Mr. Tom Laubenthal wrote EPA in November 2014 regarding The Standard Practice for Comprehensive Asbestos Surveys (ASTM E2356-18) Pre-Construction Survey (section 8 of the standard) meeting the requirement under National Emissions Standards of Hazardous Air Pollutants (NESHAPS) of a thorough inspection.  EPA responded that they would expect an owner/operator to follow the steps in Sections 1 through 5 and Section 8 to comply with the NESHAPS regulation. This standard provides a framework for conducting thorough asbestos inspections, particularly in pre-construction scenarios, ensuring that no asbestos-containing material goes unnoticed.

Conclusion: The Essential Role of Inspections

Asbestos inspections are the cornerstone of any effort to protect workers from exposure to this hazardous material. By adhering to the EPA’s and OSHA’s strict sampling and inspection guidelines, inspectors can identify asbestos-containing materials before they are disturbed, reducing the risk of airborne fibers and subsequent health issues. Given the serious implications of asbestos exposure, thorough inspections are not just a regulatory requirement—they are a moral imperative in safeguarding the health and well-being of workers.

Asbestos Floor Tiles disturbed before identification led to a clean-up costing over $250,000

In the end, the responsibility lies with all stakeholders—building owners, contractors, and asbestos inspectors alike—to ensure that every construction or renovation project is free from asbestos hazards. As inspectors, staying current on regulations, maintaining rigorous sampling standards, and educating clients on the risks and regulations associated with asbestos are critical components in this ongoing battle against a deadly substance.

The asbestos inspection panel promises to be an invaluable session for professionals across the construction, consulting, and regulatory industries. With these diverse viewpoints, we aim to shed light on the critical role inspections play in protecting workers and ensuring compliance with ever-evolving asbestos regulations.  Asbestos inspections are not just about checking boxes—they are about saving lives.


Saturday, April 24, 2021

When Do Asbestos Certificates (Hard Cards) Expire Under COVID-19? New Update: No more extensions!

… …
This question is the overwhelming number one question we at Future Environment Designs (FEDTC) are being asked at this time.  So, to answer this question we must remember that there are two agencies that regulate asbestos licensing and training.  The license (companies are licensed; individuals get certificates) or more appropriately the asbestos certificate (hard card) is issued by the New York State Department of Labor (NYSDOL).  This certificate expires annually on the last day of your birth month.  Currently, NYSDOL is enforcing expiration dates on certificates.  You may continue to work with your existing cards as long as it is not expired.  In addition, NYSDOL is no longer extending the number of days you can work with a DOH 2832 form when you took an initial course.  NYSDOL is allowing you to work with the DOH 2832 form for 45 days.

License & Hard Card (picture)
Hard card with picture (certificate) & Company license

The second agency that plays a part in this is the New York State Department of Health (NYSDOH).  The NYSDOH enforces 10 NYCRR Part 73 Asbestos Safety Program Requirements which regulates the asbestos training providers and also says that the training certificate (the DOH 2832 Form, the piece of paper you get once the class is completed) expires after one year on the date you took the training.  In addition, it has a grace period after that date that lasts a year.  Once the grace period is over you must take an initial course to get another certificate (DOH 2832) for that title.  Realize there has not been any waiver on this issue and so you will need to keep an eye on your training certificate expiration date and make sure you don't go over the grace period.  NYSDOH is now allowing virtual instructor-led courses, see FEDTC's Wednesday, May 27, 2020, blog post on the requirements for that training.  Because of this, there is no need to let your hard card or your training certificate expire.


DOH 2832 Form

Those of you who work in New York City, New York City Department of Environmental Protection (NYCDEP) regulate Asbestos Rules and Regulations, Title 15, Chapter 1 of the Rules of the City of New York.  This regulation also has certificates (NYCDEP hard cards) for individuals who are handlers, handler supervisors, investigators, and restricted handlers.  These hard cards expire every two years based on your birthday (but you must still meet the NYSDOL & NYSDOH requirements of training every year).  NYCDEP is allowing workers whose hard card expired on March 15, 2020, or later to continue to work using their existing card until August 31, 2021.  See NYCDEP's Extension of Asbestos Certification Deadline website for more information.

Hopefully, that answers everyone's questions and we hope to see you in a virtual or in-person class soon.

Wednesday, June 17, 2020

PACNY's Environmental Conference Day Three - A NYSDOL Surprises with Fast Track Variances!

The last day of the Professional Abatement Contractors of New York's (PACNY's) 24th annual Environmental Conference was held at the Turning Stone Casino in Verona, New York on Friday, February 28, 2020.  The last day started similar to the first day with opening remarks from Ms. Deb Sanscrainte, of ARAMSCO and the conference chairwoman, and Timothy Thomas of Tetra Tech and President of PACNY.  These remarks included a change in the program because a snowstorm caused the originally scheduled speaker unable to attend the conference.  The beginning presentation was by Martin S. Rutstein, Ph.D., President of Ecological Consulting & Management Services, Inc. discussing talc litigation.  Followed by Brent Kynoch of the Environmental Information Association (EIA) discussing the benefits of joining the EIA.  The Regulatory Day of the conference includes the last chance of visiting the Vendor Exhibit Hall with a continental breakfast and visit the 30 vendors to get a chance to win the vendor gift cards/prizes.

Dr.Rutstein speaking about talc litigation

After the two morning presentations, and a short break in the Vendor Exhibit Hall, the New York State Department of Labor's (NYSDOL's) Panel with a question and answer session began.  The panel included  Dr. Eileen Franko, the Director; Mr. James Meacham Program Manager, Asbestos Control Bureau; Mr. Kirk Fisher, Program Manager, Licensing & Certification; and Mr. Ed Smith, Program Manager, Engineering Services Unit.  Questions and answers session was moderated by Mr. Tim Thomas of Tetra Tech Engineering.

NYSDOL Panel Discussion

The panel started with some opening remarks by Dr. Eileen Franko which included announcing her retirement in March 2020.  Making this the last year she will be on the panel.  Those of us who have gotten to know Dr. Franko through the years will miss her leadership and her willingness to listen to the industry and work with the industry to better things for all contractors and consultants.  As usual, the discussion of a new industrial code came up and it is still being worked on.  Mr. Smyth announced, to everyone's surprise, that they had launched a pilot program for certain site-specific variances (SSVs).  This pilot program is called Fast Track Variances.  These variances are common variances that are issued regularly by NYSDOL.  The purpose of this program is to speed up the review process for these routine variances and reduce the workload.  Currently, SSVs can take two to three weeks to turnaround.  Fast Track Variances can potentially be issued within the same day they are received.  There are 10 Fast Track Variances available and can be found at NYSDOL's Division of Safety and Health (DOSH) Engineering Services Unit's website.  Mr. Meacham discussed enforcement regarding Article 32 the NYS Mold Law.  NYSDOL has received 175 complaints and has issued 30 violations.  Most of the complaints are tenant-landlord complaints which do not apply to the law.

Future Environment Designs was a Gold Sponsor of PACNY's Environmental Conference

Another conference has ended and another successful year for PACNY with over 600 people attending the conference with 30 vendors exhibiting in the Vendor Exhibit hall both increases versus last year.  Though we are happy for Dr. Franco and wish her all the best, the industry will miss her.  Though she does leave us with a solid group of professionals running the various divisions that matter to the asbestos and mold industries.  Hope to see you next year!  

Sunday, March 25, 2018

Winter Storm Impacts PACNY Conference, Part One.

Turning Stone Lodge before the Storm
This year was the Professional Abatement Contractors of New York (PACNY) 22nd Annual Environmental Conference.  This year's conference was overshadowed by Winter Storm Riley which turned into a Nor'easter and hit Turning Stone Casino between Thursday night & Friday Morning, March 1-2, 2018 with about 7 inches of snow.  Which put a dampener on attendance with only a few Long Islanders making the conference this year.  However, the Vendor Display/Exhibit Hall seemed to have the usual amount of vendors, maybe we even had more than the usual.  This year's schedule was a little different from past years in that presenters were given a little more time for their presentations and more time was given between presentations to spend in the Vendor Display/Exhibit Hall.  As usual the PACNY Board did an excellent job of putting everything together, which special accolades to Ms. Deborah Sanscrainte of Aramsco, the conference chairperson and Ms. Lisa Brown of Summit Environmental, Administrator.

Mr. Meacham discussing the Enforcement Process

The first day, known as Proficiency Workshop day consisted of two presentations the first was Mr. James Meacham, PE, program manager for New York State Department of Labor' (NYSDOL)'s Asbestos Control Bureau (ACB), discussing "Solving the Mysteries of the Asbestos Control Bureau".  Mr. Meacham's presentation went through the process of an inspection, the issuance of a Notice of Violation (NOV), and then continued with the process of resolving the NOV.  His presentation did an excellent job of bringing transparency to the enforcement process.  A key point of Mr. Meacham's presentation, was the response from the contractor (violator) issued the NOV.  Contractors have two opportunities to address a violation, onsite during the inspection and the second time, is when responding to the written violation.  Onsite, if their is no dispute contractors should stop work, fix the discrepancy(ies) and document the actions in the logbook.  If there is a discrepancy, contractors should work towards complying with what can be done, document your position on the deficiency, and document your corrective actions in the logbook.  When a violator receives a violation,  the contractor should review the project with their staff, gather the compliance documentation, and submit a response to the NOV.  This is important part of the process and could go a long way in mitigating violations.

Mr. Meacham discussing the Violation Review Process
The second presenter was Mr. Kevin Hutton, of Cornerstone Training Institute, discussing "Complexities of NYSDOL, OSHA, and EPA".  Mr. Hutton provided a handout called a "Guide to NYS CR56-11.1 In-Plant Operations", this guide provided basic information regarding how Industrial Code Rule 56 handles the requirements for in-plant operations and what Occupational Safety and Health Administration (OSHA) 1926.1101 work practices would apply under in-plant operations.  In addition, Mr. Hutton's presentation, discussed NYSDOL Engineering Service Unit's addition of full-time project monitoring to many variance applications.  The additions have included wording of what the responsibilities of the project monitor are for these variances (since Industrial Code Rule 56, itself, does not provide much information regarding that).  Which brings up the question whether project monitors realize the scope of their responsibilities on such projects.  We suspect not, since we've already seen some project monitors being issued violations for not following the variance requirements.


Mr. Hutton discussing full-time Project Monitoring added to Variances
That ended the first day of presentations, with later that evening the PACNY President's (Joseph Cantone, of Colden Corporation) reception was held, where many of us gathered and discussed concerns regarding the pending storm.  Stay tuned for Part Two the Technical Sessions and the Vendor Reception!

The Role of Asbestos Inspections in Construction Safety: Don't Miss the Asbestos Inspection Panel at PACNY's Environmental Conference!

In the construction world, one of the most pressing concerns for worker safety is the potential asbestos exposure.  This hazardous material,...