Search This Blog

Showing posts with label PCB Training. Show all posts
Showing posts with label PCB Training. Show all posts

Monday, April 17, 2017

PACNY's Environmental Conference - The Very Technical Sessions - Day Two!

The second day of the Professional Abatement Contractors of New York (PACNY) environmental conference at the Turning Stone Casino in Verona, NY started with the Technical Sessions.  The day started with opening remarks from Sean Hart, of Energy & Environment, President of PACNY and Deb Sanscrainte, of Aramsco, the Conference Chair.  This year's Technical Session seemed much more intense & focused with a lot of good information presented.  The presentations kicked off with Dr. Martin Rutstein, of Ecological Consulting & Management Services, discussing "Talc with Tremolite & Other Amphiboles." Discussed the issues of talc contaminated with asbestos or silica and the potential for diseases correlated to talc related asbestosis, silicosis or talcosis.  Dr. Rutstein's presentations are always entertaining and are eye opening in regards to the science of geology.  The next presenter was Mr. Tom Laubenthal, of The Environmental Institute (a division of ATC Group Services) discussing "Using ASTM E2356 Standard Practice for Comprehensive Building Surveys".  Mr. Laubenthal's discussion brought up interesting points regarding the use of Safety Data Sheets (SDS) and Architect/Engineer Certifications of no asbestos containing materials used as part of the Environmental Protection Agency's (EPA's) Asbestos Hazard Emergency Response Act (AHERA) and its applicability for the purposes of a "thorough inspection" under the EPA's National Emission Standards for Hazardous Air Pollutants (NESHAPS).  After Mr. Laubenthal's presentation, we took a break to wander the Vendor Exhibit Hall and meet with some of the vendors like Grayling/ILC Dover (glovebags, etc.) and AMA Analytical (laboratory services).

Mr. Ed Stuber, of Galson Laboratories
We returned from the break for Mr. Ed Stuber's, of Galson Laboratories, update on the "Occupational Safety and Health Administration's (OSHA's) Silica regulation."  One of the key points of his presentation is that the silica standard is no longer a moving target.  Previously, the standard was based on a formula.  The current standard has a set permissible exposure limit (PEL) of 50 micrograms per cubic meter and a set action level of 25 micrograms per cubic meter.  In additions, it is very important to ensure you see the lab's proficiency testing data because labs that analyze silica samples have till June 23, 2018 to comply with the OSHA standard.  Dr. Chris Goulah, of EMSL Analytical, presented on "Legionella".  The presentation was on the New York City outbreak in 2015 and the regulations created by New York City (NYC) and New York State (NYS) to protect against Legionella.  Dr. Goulah's presentation noted that Legionnaires' Disease is on the rise since 2000 and that most cases are the result of exposure to Legionella asssociated with building water systems (potable & non-potable).  Mr. Jim Redmond, of Associated General Contractors of NYS, gave us a "Regulatory Update on OSHA."  Mr. Redmonds discussed the electronic submission of injuries and illnesses (goes into effect on July 1, 2017 for more information visit OSHA's website) and construction industry citations based on the multi-employer work-site policy (creating, exposing, correcting, & controlling).  We then broke for the buffet lunch and another stroll through the Exhibit Hall and meet vendors like DiVal Safety Equipment and Frederico Demolition.

Brent Kynoch of EIA
The afternoon started with Dr. James Haklar, from EPA Region 2, discussing "Polychlorinated Biphenyl (PCBs) Case Studies".    Dr. Haklar's presentation discussed the primary sources of PCBs in buildings (caulk, fluorescent light ballasts, paints and mastics) and secondary sources (building materials contaminated by releases of PCBs from the primary sources).  Dr. Haklar's presentation also discussed exposure levels for evaluating PCBs in Indoor School Air (to keep the total exposure below the oral reference dose of 20 nanograms PCB per kilogram-day) and the EPA's agreement with NYC.  Up next was Mr. Brent Kynoch, of the Environmental Information Association (EIA), updating us on "What Does Toxic Substance Control Act (TSCA) Reform Mean to the Asbestos Abatement Industry?"  Mr. Kynoch discussed "unreasonable risk" and the EPA's need to take final risk management action within 2 years or 4 years if an extension is needed.  In addition, Mr. Kynoch informed us that asbestos was selected in the "Top 10" chemicals for review by EPA and as of the PACNY conference the public comment period was open (it has since closed, here is the docket information:  https://www.regulations.gov/docket?D=EPA-HQ-OPPT-2016-0736).  The final speakers for the day were Mr. Cole Stanton, of Fiberlock Technologies, and Mr. Fred Schauf, of Spectrum Environmental presenting on "Environmental Indicators: Changes in Policy and Practice that WILL Impact Restoration & Abatement in 2017 -2018 and Beyond."  Mr. Stanton and Mr. Schauf discussed the 2016 Indoor Air Quality Association (IAQA) report to NYS Department of Labor (NYSDOL).  This report indicated the following:

Mr. Cole Stanton, of Fiberlock Technologies, and Mr. Fred Schauf, of Spectrum Environmental
  • Remediators perform own assessments/final inspections
  • Mold Remediation Plans are incomplete:
    • No quantities per work area
    • No Personal Protective Equipment (PPE) mentioned
    • EPA registered biocides etc. without specifying a product
    • No method for remediation, only "industry standards"
    • No cost estimate
  • Non NYSDOL licensed assessors provide the inspection/assessment.
  • Real Estate agents are assessing and preparing Mold Remediation Plans for properties they are listing (does not appear to violate Article 32, it does appear to violate their code of ethics.)
  • Mold remediators are still providing homeowners with checklist used as assessment and mold remediation plan
  • and/or, No Mold Remediation Work Plans provided.
  • Training Quality needs significant improvement:
    • Incorrect information presented, such as: asbestos testing is not necessary as mold takes precedence over asbestos containing materials; a check list by the homeowner is OK; sampling is required; biocides are preferable to removal.
    • Classes last less than 5 hours a day
    • Mold assessment classes being taught by teachers without mold experience.
Vendor Reception in the Exhibit Hall
That ended the Technical Sessions on day 2.  The Vendor Reception in the Exhibit Hall started, where further networking with the vendors and the attendees continued.  It was a very informative day 2 and the amount of information was fantastic.  Looking forward to day 3 and our presentation.  Thank you to the Long Island contingent that attended the conference this year.


Part of the Long Island Contingent that Attended This Year 
Related articles:

Thursday, June 09, 2011

EPA Announces the Second Phase of Historic Hudson River Cleanup Underway

Lakes Entrance Dredger April HamerImage via Wikipedia (Glens Falls, N.Y. – June 6, 2011) The U.S. Environmental Protection Agency (EPA) today announced that the dredging of sediment contaminated with polychlorinated biphenyls (PCBs) has resumed in the Upper Hudson River, marking the start of the second and final phase of the Hudson River cleanup.  The historic dredging project targets approximately 2.4 million cubic yards of PCB-contaminated sediment from a forty-mile section of the Upper Hudson River between Fort Edward and Troy, NY.  PCBs are potentially cancer-causing in people and build up in the fat of fish and mammals, increasing in concentration as they move up the food chain.  The primary risk to humans is the accumulation of PCBs in the body from eating contaminated fish.  General Electric (GE) is conducting the cleanup work with EPA oversight, under an agreement with the Agency.  This final phase of the cleanup project is expected to take five to seven years to complete.

During the 2011 dredging season, mechanical dredges will collect buckets of PCB-contaminated sediment from a 1.5-mile stretch of river just south of the town of Fort Edward.  Four to six dredges will work 24 hours a day, six days a week through the summer and fall to remove approximately 350,000 cubic yards of PCB-contaminated sediment from 100 acres of river bottom.  Dredging will begin in the western channel of Roger’s Island and move south in the main stem of the river.  Between 1947 and 1977, an estimated 1.3 million pounds of PCBs were discharged into the river from two GE capacitor manufacturing plants located in Fort Edward and Hudson FallsInformation about the Hudson River PCBs Superfund site can be found at http://www.epa.gov/hudson.

People seeking general information about the project are encouraged to contact Larisa Romanowski at (518) 747-4389; romanowski.larisa@epa.gov.   Residents who have questions or concerns related to dredging operations should call GE’s 24-hour dredging information phone line at (518) 792-4087, or, toll-free (888) 596-3655.
Enhanced by Zemanta

Conference Season Starts in 3 Months Save the Date: PACNY 2025 Environmental Conference & EIA 2025 National Conference

With the end of 2024 fast approaching, we are looking ahead to 2025, we are excited to announce the dates for the Professional Abatement Con...