During the 2011 dredging season, mechanical dredges will collect buckets of PCB-contaminated sediment from a 1.5-mile stretch of river just south of the town of Fort Edward. Four to six dredges will work 24 hours a day, six days a week through the summer and fall to remove approximately 350,000 cubic yards of PCB-contaminated sediment from 100 acres of river bottom. Dredging will begin in the western channel of Roger’s Island and move south in the main stem of the river. Between 1947 and 1977, an estimated 1.3 million pounds of PCBs were discharged into the river from two GE capacitor manufacturing plants located in Fort Edward and Hudson Falls. Information about the Hudson River PCBs Superfund site can be found at http://www.epa.gov/hudson.
People seeking general information about the project are encouraged to contact Larisa Romanowski at (518) 747-4389; romanowski.larisa@epa.gov. Residents who have questions or concerns related to dredging operations should call GE’s 24-hour dredging information phone line at (518) 792-4087, or, toll-free (888) 596-3655.
No comments:
Post a Comment