Search This Blog

Monday, April 17, 2017

PACNY's Environmental Conference - The Very Technical Sessions - Day Two!

The second day of the Professional Abatement Contractors of New York (PACNY) environmental conference at the Turning Stone Casino in Verona, NY started with the Technical Sessions.  The day started with opening remarks from Sean Hart, of Energy & Environment, President of PACNY and Deb Sanscrainte, of Aramsco, the Conference Chair.  This year's Technical Session seemed much more intense & focused with a lot of good information presented.  The presentations kicked off with Dr. Martin Rutstein, of Ecological Consulting & Management Services, discussing "Talc with Tremolite & Other Amphiboles." Discussed the issues of talc contaminated with asbestos or silica and the potential for diseases correlated to talc related asbestosis, silicosis or talcosis.  Dr. Rutstein's presentations are always entertaining and are eye opening in regards to the science of geology.  The next presenter was Mr. Tom Laubenthal, of The Environmental Institute (a division of ATC Group Services) discussing "Using ASTM E2356 Standard Practice for Comprehensive Building Surveys".  Mr. Laubenthal's discussion brought up interesting points regarding the use of Safety Data Sheets (SDS) and Architect/Engineer Certifications of no asbestos containing materials used as part of the Environmental Protection Agency's (EPA's) Asbestos Hazard Emergency Response Act (AHERA) and its applicability for the purposes of a "thorough inspection" under the EPA's National Emission Standards for Hazardous Air Pollutants (NESHAPS).  After Mr. Laubenthal's presentation, we took a break to wander the Vendor Exhibit Hall and meet with some of the vendors like Grayling/ILC Dover (glovebags, etc.) and AMA Analytical (laboratory services).

Mr. Ed Stuber, of Galson Laboratories
We returned from the break for Mr. Ed Stuber's, of Galson Laboratories, update on the "Occupational Safety and Health Administration's (OSHA's) Silica regulation."  One of the key points of his presentation is that the silica standard is no longer a moving target.  Previously, the standard was based on a formula.  The current standard has a set permissible exposure limit (PEL) of 50 micrograms per cubic meter and a set action level of 25 micrograms per cubic meter.  In additions, it is very important to ensure you see the lab's proficiency testing data because labs that analyze silica samples have till June 23, 2018 to comply with the OSHA standard.  Dr. Chris Goulah, of EMSL Analytical, presented on "Legionella".  The presentation was on the New York City outbreak in 2015 and the regulations created by New York City (NYC) and New York State (NYS) to protect against Legionella.  Dr. Goulah's presentation noted that Legionnaires' Disease is on the rise since 2000 and that most cases are the result of exposure to Legionella asssociated with building water systems (potable & non-potable).  Mr. Jim Redmond, of Associated General Contractors of NYS, gave us a "Regulatory Update on OSHA."  Mr. Redmonds discussed the electronic submission of injuries and illnesses (goes into effect on July 1, 2017 for more information visit OSHA's website) and construction industry citations based on the multi-employer work-site policy (creating, exposing, correcting, & controlling).  We then broke for the buffet lunch and another stroll through the Exhibit Hall and meet vendors like DiVal Safety Equipment and Frederico Demolition.

Brent Kynoch of EIA
The afternoon started with Dr. James Haklar, from EPA Region 2, discussing "Polychlorinated Biphenyl (PCBs) Case Studies".    Dr. Haklar's presentation discussed the primary sources of PCBs in buildings (caulk, fluorescent light ballasts, paints and mastics) and secondary sources (building materials contaminated by releases of PCBs from the primary sources).  Dr. Haklar's presentation also discussed exposure levels for evaluating PCBs in Indoor School Air (to keep the total exposure below the oral reference dose of 20 nanograms PCB per kilogram-day) and the EPA's agreement with NYC.  Up next was Mr. Brent Kynoch, of the Environmental Information Association (EIA), updating us on "What Does Toxic Substance Control Act (TSCA) Reform Mean to the Asbestos Abatement Industry?"  Mr. Kynoch discussed "unreasonable risk" and the EPA's need to take final risk management action within 2 years or 4 years if an extension is needed.  In addition, Mr. Kynoch informed us that asbestos was selected in the "Top 10" chemicals for review by EPA and as of the PACNY conference the public comment period was open (it has since closed, here is the docket information:  https://www.regulations.gov/docket?D=EPA-HQ-OPPT-2016-0736).  The final speakers for the day were Mr. Cole Stanton, of Fiberlock Technologies, and Mr. Fred Schauf, of Spectrum Environmental presenting on "Environmental Indicators: Changes in Policy and Practice that WILL Impact Restoration & Abatement in 2017 -2018 and Beyond."  Mr. Stanton and Mr. Schauf discussed the 2016 Indoor Air Quality Association (IAQA) report to NYS Department of Labor (NYSDOL).  This report indicated the following:

Mr. Cole Stanton, of Fiberlock Technologies, and Mr. Fred Schauf, of Spectrum Environmental
  • Remediators perform own assessments/final inspections
  • Mold Remediation Plans are incomplete:
    • No quantities per work area
    • No Personal Protective Equipment (PPE) mentioned
    • EPA registered biocides etc. without specifying a product
    • No method for remediation, only "industry standards"
    • No cost estimate
  • Non NYSDOL licensed assessors provide the inspection/assessment.
  • Real Estate agents are assessing and preparing Mold Remediation Plans for properties they are listing (does not appear to violate Article 32, it does appear to violate their code of ethics.)
  • Mold remediators are still providing homeowners with checklist used as assessment and mold remediation plan
  • and/or, No Mold Remediation Work Plans provided.
  • Training Quality needs significant improvement:
    • Incorrect information presented, such as: asbestos testing is not necessary as mold takes precedence over asbestos containing materials; a check list by the homeowner is OK; sampling is required; biocides are preferable to removal.
    • Classes last less than 5 hours a day
    • Mold assessment classes being taught by teachers without mold experience.
Vendor Reception in the Exhibit Hall
That ended the Technical Sessions on day 2.  The Vendor Reception in the Exhibit Hall started, where further networking with the vendors and the attendees continued.  It was a very informative day 2 and the amount of information was fantastic.  Looking forward to day 3 and our presentation.  Thank you to the Long Island contingent that attended the conference this year.


Part of the Long Island Contingent that Attended This Year 
Related articles:

Wednesday, March 29, 2017

PACNY's Environmental Conference - Day 1 - And So It Begins!

This year's Professional Abatement Contractors of New York (PACNY) 21st Annual Environmental Conference was definitely more technical then previous years.  The first day of the PACNY environmental conference started with the Proficiency Workshop for Trainers.  The Proficiency Workshop speakers consisted of Mr. Kevin Malone, Director of New York State Department of Health (NYSDOH); Mr. Don Pierce of New York State Department of Labor (NYSDOL); and Mr. Kevin Hutton of Eastcoast Resources; and Mr. Ed Smith of NYSDOL Engineering Services Unit.

It was a modest Day One which started with networking during lunch. Mr. Malone started the presentations by providing us with an update on the statistics of the asbestos training program.  As we have come to expect the number of individuals attending asbestos courses shrinks every year.  The 2016 stats were 26,734 total certs issued broken done 21,642 refresher certs and 5,092 initial certs issued at 3,349 total classes held.  Those numbers are down from the 2015 stats that were 27,731 total certificates issued with 22,074 refresher certs and 5,657 initial certs issued at 3,436 training courses.
 
Mr. Kevin Malone of NYSDOH
The next presenter was Mr. Pierce discussing the Asbestos Hazard Emergency Response Act (AHERA) auditing update.  For those of you who don't know, the Environmental Protection Agency (EPA) has been providing New York State (NYS) with a grant to perform audits of public and private school's AHERA required management plans.  The presentation included a discussion on the process of selecting schools to be audited (randomly selected and/or based upon cause {complaint}), how the data is collected and how the information is provided back to EPA.  In addition, Mr. Pierce discussed several issues the audits have found:
  • EPA accepts electronic record-keeping, but hard copies of the original survey and asbestos management plan must be maintained at the Local Education Agency (LEA) office.
  • The LEA must assign and train a designated person to oversee asbestos activities and ensure compliance with AHERA requirements.  The designated person must be trained but does not require them to be accredited and does not list a specific course or specific number of hours. It does list specific training topics which include - health effects; detection, identification, & assessment of asbestos; options for controlling asbestos; asbestos management plan topics; and relevant Federal, State, and local regulations for asbestos.  As a side note: Future Environment Designs (FEDTC) recommends designated persons take the asbestos inspector (3 day) and management planner (2 day) initial courses to meet the AHERA requirements.
  • EPA allows two methods for new additions to existing buildings.  An architect or project engineer responsible for the construction of a new school building after October 12, 1988 or an accredited inspector to:
    • to sign a statement that no asbestos containing building materials (ACBM) was specified as a building material in any construction document for the building, or
    • to the best of his or her knowledge, no ACBM was used in any building material in the building.
    • The LEA must submit a copy of this statement to the EPA Regional Office and shall include the statement in the management plan of the school.
  • Deficiencies found by the audit included:
    • Periodic surveillances were missing or weren't well documented
    • Documentation of notifications not included or well documented
    • ACBM removal not updated in the management plan
    • Clearance air monitoring records not available per AHERA
Mr. Don Pierce of NYSDOL
After a short break, the Variance Writing Workshop with Mr. Hutton and Mr. Smith was up next.  This nearly two-hour presentation, got into the details of submitting and writing variances that Mr. Smith's Engineering Services Unit (ESU) reviews for approval, disapproval, or modification. Some of the points discussed:
Mr. Kevin Hutton of Eastcoast Resources
  • According to the Asbestos School Hazard Abatement Re-authorization Act (ASHARA) an asbestos project designer is required on Public and Commercial Building asbestos projects (including residential buildings with 10 or more dwellings).
  • When writing a variance consider your audience: DOL ESU; Abatement Contractor, Project Monitor; Asbestos Control Bureau (ACB) Inspector; Occupational Safety and Health Administration (OSHA) Inspector (Compliance Safety Officer); and the Courts.
  • Mr. Smith discussed that his department handles between 1400-1500 variances a year.  About 25% are then reopened, with another 5% reopened a second time and another 5% reopened a third time.  Mr. Smith also provided us with a list of Pet Peeves regarding variance applications which included:
    • Failing to explicitly list what code sections you are requesting relief from
    • Don't be lazy and simply submit someone else's variance and state you want to do what is in that variance.  Own your work, your client is paying you to apply for a variance on their behalf.
    • "State-Wide" emergencies
    • Try to limit your write-up to the hardship and proposed steps to be taken to work around the hardship.
Mr. Ed Smith of NYSDOL Engineering Services Unit
Variance workshop ended the first day of the Conference.  That evening we celebrated & networked at the President's Reception featuring Dan the Magic Man!
John of TS Steakhouse at Turning Stone Casino

Still Not a #BanAsbestos: Over 40 Years in the Asbestos Industry and the Ongoing Fight for Real Change

As we celebrate our country's 249th anniversary of the adoption of the Declaration of Independence, recent events have caused us to spe...